Stainless steel process racks, designed and fabricated by PKG, provide venting and draining of kegs through one hole when traveling from station to station. These racks are transported through the line via an automated hoist. The hoist has three modes of operation; manual, semi-automatic, and automatic, and a capacity of 2000 pounds. The automated system includes a control panel with programmable controller and touch screen operator interface. A data collection system was provided to aid in troubleshooting and for recording temperatures, level control, immersion times, and other process parameters.
The ventilation system consisted of PVC hoods, ductwork with blast gates for control and balancing of the system, a 33,000 cfm exhaust fan, and push air on all vented tanks. Hoods were mounted along the back of the tank line. A make-up air heating unit was also provided to balance the air in the building.
An automatic wastewater treatment system included a sump tank with pump, 1500 gallon surge tank, 1500 gallon storage tank, two stage reactor tank with pH analyzers, chemical feed pumps, mixers, and a final discharge tank with pump and pH analyzer to check final pH levels. Holding tanks of molded XLPE were also provided for nitric acid and alkaline cleaner/citric acid.
The containment area, coated with Hi-Chem Rhino Lining, encompassed the tank line and wastewater treatment system.
Start-up assistance was provided with the turnkey installation.